Combining three brackets and a cover into one molding can remove fasteners and tolerance interfaces. It can also create an impossible undercut, mixed material requirement, expensive common tool, difficult repair or a single defect that scraps the whole assembly. Fewer parts is not automatically lower total cost.

Use functional separation criteria first: relative motion, different material, assembly sequence, access, replacement, appearance and validation. Then evaluate consolidated geometry for draw, actions, wall/cooling, tolerance and change risk. Compare product-level tooling, piece, assembly, quality, logistics and lifecycle cost before removing a joint.

Identify why each part is separate

Historical part boundaries may be accidental, while others carry essential motion, material or service functions.

For every component, ask whether it must move relative to others, use a different material, be installed separately, provide access, be replaced, or isolate a failure or appearance process.

Boothroyd Dewhurst uses functional criteria to challenge separate parts. Boothroyd Dewhurst’s DFMA method states three minimum-part criteria — a part is a candidate for elimination unless it must move relative to adjacent parts, must be a different material, or must be separate for assembly or disassembly: DFMA Product Simplification. Apply the three questions to every joint before costing anything:

DFMA minimum-part question If the answer is yes If the answer is no
Must this part move relative to adjacent parts? Keep it separate (or design the motion into the molding) Candidate for elimination
Must it be a different material? Keep it separate (or compare overmolding / inserts) Candidate for elimination
Must it be separate for assembly or disassembly? Keep it separate (service access, replacement) Candidate for elimination

Apply them with automotive service and validation context. A gasket, flexible hinge, metal shield or optical lens may need a different material. A cover may provide service access. A sacrificial clip may protect an expensive housing. Record the purpose of each joint—locating, fastening, sealing, isolating vibration, compensating tolerance or allowing sequence. Parts without a defensible purpose become consolidation candidates; necessary boundaries should be improved rather than removed.

Build the review around functional decomposition, motion and material map, assembly sequence, service plan and joint purpose. Keep the part number, drawing revision, material condition, lot or cavity identity, equipment state and observation method beside the result. The decision is whether each retained boundary has a necessary function and each removal candidate is explicit. A result from a different geometry, resin grade, production cell or conditioning state can be useful background, but it is not automatically transferable. Record the mismatch and decide whether a controlled comparison is required. Removing historical boundaries reduces handling, but can eliminate replaceability, compliance or tolerance accommodation that the assembly relied on. Set a named owner and an evidence-based closure condition before the next irreversible commitment.

Check whether one part can be molded

A consolidated CAD model may contain opposing undercuts, deep cores, thick intersections and inaccessible steel.

Run DFM on draw direction, parting, slides/lifters, wall thickness, flow, cooling, ejection, texture and machine envelope. Compare redesign alternatives before accepting complex actions.

Combining parts can turn two simple tools into one large action-heavy mold. Internal channels and clips may trap the core. Overlapping walls create sink and long cooling. A larger projected area can require another press. Gate and weld-line locations may move into loaded regions. Estimate tool maintenance and spare details. If the design depends on collapsing cores or complex sequences, compare keeping one strategic joint. A consolidated part should not be approved because additive-manufactured prototypes can make the geometry.

The working record should contain consolidated DFM, tool concept and motion study, section/mass map, press fit and maintenance scope rather than a conclusion copied into email. Review the source, revision, units, sample selection and boundary conditions, then test whether the combined geometry has a reliable production-tool route within the intended equipment. Preserve failed or marginal observations as well as passing ones; otherwise the team cannot see where the recommendation stops being reliable. One complex mold removes assembly but concentrates capital, capacity and downtime; two simple molds add handling while offering redundancy. The tooling-cost arithmetic for one large mold vs several smaller ones is worked through in the cavity comparison: Single vs. Multi-Cavity and Family Molds: Automotive Cost Comparison. Translate the accepted condition into the drawing, purchase specification, setup sheet, inspection instruction or change record that production will actually use.

Rebuild tolerance and assembly logic

Removing joints removes some stack-ups but also removes adjustment, float and compliant alignment.

Recalculate functional datums and tolerance chains for the consolidated part and its neighbors. Preserve needed compliance through geometry only when it can be molded and validated.

Separate components may be located independently to two mating systems. Combining them forces one datum scheme and can transmit mold shrinkage across a larger span. Slots, floating bosses or compliant arms may replace assembly adjustment, but their strain and wear need review. Measure in free and installed conditions where restraint matters. A larger molding can warp more than the individual pieces. Do not assume fewer drawing dimensions means easier control; the remaining characteristics may become longer and more coupled.

Ask the supplier to connect old/new datum map, tolerance stacks, assembly constraints, warpage prediction and functional-gauge concept to the proposed part and production state. The evidence is sufficient only when consolidation preserves fit without relying on lost adjustment or unmeasurable compensation. If inspection cannot observe the mechanism directly, identify the proxy being used and how it was correlated. Do not average incompatible results or hide a trend by pooling cavities, lots, left/right versions or process stages. Integrated locators reduce assembly variation, while distributed interfaces can absorb molding and body-in-white variation more safely. Define what change would invalidate the conclusion and route that trigger through normal change control.

Compare materials and secondary processes

Parts may be separate because one needs stiffness, flexibility, low friction, shielding, paint, texture or chemical resistance.

Define each region’s material and surface function and determine whether one grade and process can satisfy them. Evaluate overmolding, inserts or coatings only with their added interfaces and validation.

A single resin selected for the most severe region may increase cost or reduce performance elsewhere. Adding metal inserts, TPE or coatings can restore functions but may create more complex tooling and supply. Different colors or grains may force painting or masking. Heat staking or screws can sometimes remain the cleaner architecture. Compare recycling and service statements only where supported. The material bill and customer approvals must be updated; an existing approval for separate parts does not automatically transfer to one combined molding.

Use regional material/property map, surface and joining requirements, candidate grade evidence and process compatibility to challenge the preferred option. Confirm who produced the record, what population it represents, and whether the current acceptance method could miss the relevant failure. The release test is whether one material/process system meets all consolidated functions without unsupported compromise. Material simplification helps purchasing and molding; multi-material solutions may keep function but erase the cost and complexity benefit. Where evidence remains incomplete, authorize only bounded work at risk, with a quantity or activity limit, responsible owner and follow-up record. Commercial urgency does not turn an assumption into product approval.

Calculate total cost and common-mode risk

Piece-count savings can be offset by larger tooling, cycle, scrap value, validation and expensive change exposure.

Compare fixed tooling/fixtures/validation and variable material, machine, labor, assembly, inspection, packaging, yield and maintenance at program volumes. Add scenarios for downtime and engineering change.

A rejected consolidated part scraps all integrated functions. One tool outage stops the whole assembly, while separate parts may have buffers. Conversely, removing fasteners and stations reduces labor, mistakes, inventory and supplier transactions. Use credible quotes and measured cycles, not generic percentage savings.

Worked comparison — illustrative, assumptions stated

Assumptions (replace with quoted figures — every number below is an assumed value for method demonstration only, not AutoMoldingPro data): three separate brackets consolidated into one housing; annual volume 100,000 assemblies; assembly labor 12 seconds per fastener; scrap rate 2% in both cases.

Current: 3 separate brackets Consolidated: 1 housing
Tooling 3 tools × $15,000 = $45,000 1 tool $32,000 (with 2 slides)
Piece price 3 × $0.40 = $1.20 per assembly $0.85 per assembly
Assembly 3 fasteners × 12 s = 36 s per assembly 1 fastener × 12 s = 12 s per assembly
Scrap at 2% 2,000 parts × $1.20 = $2,400/year 2,000 parts × $0.85 = $1,700/year

Arithmetic, shown so the buyer can re-run it: tooling saving $45,000 − $32,000 = $13,000; piece saving ($1.20 − $0.85) × 100,000 = $35,000/year; assembly saving (36 − 12) s × 100,000 = 2,400,000 s = 667 hours/year; scrap saving $2,400 − $1,700 = $700/year.

What the numbers do NOT decide: one rejected consolidated part scraps all three functions ($0.85) where one rejected bracket scraps only $0.40; one tool outage stops the whole assembly where separate tools may have buffers; a late change to one feature forces modification of the common tool. On these assumed figures consolidation pays — but only if the tool-risk, change-risk and service lines are accepted alongside the savings. If the cover must remain serviceable, it stays a separate part whatever the arithmetic says.

Consider capital timing and whether a late change to one feature forces modification of the common tool. The multi-part quotation guide helps preserve BOM scope; consolidation needs an old/new product-level comparison. Where the consolidation is a soft/hard material combination rather than one rigid molding, compare it with overmolding: Overmolding vs. Single-Shot Molding: Tooling Cost.

Before closing this point, reconcile old/new BOM and routing, tooling and validation quotes, cycle/yield assumptions, inventory and change scenarios with the controlled product definition. The reviewer should be able to show that the architecture is preferred on total program cost and operational risk, not part count alone. Check at least one credible boundary condition when the mechanism is sensitive to temperature, time, load, moisture, orientation or machine response. Consolidation removes recurring assembly cost but increases common-tool exposure and the cost of a defect or change in one region. Keep superseded data and mark the cut-in point of any correction so later complaints or deviations can be contained to the right population.

Plan validation, service and change control

A consolidated part changes interfaces, failure containment, repair route and submission scope even if external geometry remains similar.

Define comparative fit/function, environmental and durability tests, service replacement, traceability and customer approval. Establish change ownership for the integrated drawing and tool.

Test the new part in the full assembly and compare loads previously absorbed by joints. Include clips, seals, vibration, thermal cycling and appearance as applicable. Determine whether service now replaces a larger expensive unit and whether access remains. Traceability should identify the one molding and any inserts or secondary operations. Update PFMEA, control plan, gauges and PPAP scope under customer requirements. Preserve a rollback or staged prototype route before committing production steel.

Release from this stage should cite validation delta, service/removal review, risk documents, traceability and customer change authorization and explain why the consolidated architecture is approved across manufacturing, product, service and quality responsibilities. A polished report is not enough if it omits original readings, specimen state, cavity identity, units or the applicable requirement. A staged bridge tool or prototype assembly reduces uncertainty but adds development cost before production consolidation. Close the loop by defining the ongoing check, reaction threshold and escalation route. The purpose is not extra paperwork; it is to keep the validated condition recognizable when production, demand or supply circumstances change.

Part-boundary decision matrix

Evaluate each proposed joint removal against product and production requirements.

Review line Input or evidence Decision or action
Function Motion, material, sequence, access, service and isolation Keep necessary boundaries
Moldability Draw, actions, walls, cooling, ejection and press Prove one-part route
Tolerance Datums, stack, compliance and warpage Preserve fit
Materials Regional properties, surfaces and secondary processes Avoid compromise
Economics Tool, part, assembly, scrap, downtime and change Compare total cost
Approval Validation, service, risk files and customer change Release architecture

A useful result may consolidate some parts while deliberately retaining one service cover, compliant joint or material boundary. The objective is better system value, not the lowest count.

Applying the method to a defined situation

Three brackets and a removable access cover are proposed as one housing. Functional review shows the brackets have no relative motion, but the cover must remain serviceable. DFM finds the fully integrated version needs two extra slides and creates a thick intersection. The team consolidates the brackets into the main housing, cores the junctions and retains the cover with an improved joint. Old/new tolerance stacks, tooling, assembly, scrap and service costs are compared before customer change approval.

The conclusion in this situation depends on the stated inputs. Change the material, geometry, load, equipment, quantity, environment or customer requirement and the review must be reopened at the affected line. The value of the exercise is the visible path from input to decision, not the use of a convenient universal number.

Turn the worked review into a short decision record before the team acts. Identify the exact part family and revision, the decision owner, the supplier input date and the next commitment that would become expensive to reverse. Under “Identify why each part is separate,” record the starting condition and the evidence that is already controlled. Under “Compare materials and secondary processes,” identify the most credible alternative and the consequence of accepting it. Under “Plan validation, service and change control,” state the release condition and the event that would reopen the decision. The first review lines to complete are Function, Moldability, Tolerance. Do not mark a line closed merely because a document was received; record whether its revision, sample population, units and boundary conditions match the program being discussed.

Questions for the supplier review

  • Why does each current part and joint exist?
  • Can the combined geometry mold and cool reliably?
  • Which adjustment or compliance disappears with the joint?
  • Can one material and surface process serve all regions?
  • How do scrap, downtime and change costs move?
  • What validation and service changes require approval?

A useful response identifies the controlled source, explains assumptions and exceptions, and names the record that will close the issue. Ask for original evidence where the decision is material; a yes/no answer without part, process and revision context is not enough for tooling or production release.

Information to submit for a project-specific review

Provide assembly CAD/BOM, part functions and materials, joint and assembly sequence, service plan, volumes, current tooling/assembly costs, critical tolerance stacks and validation requirements. Use the AutoMoldingPro request form to keep the current drawing, STEP file, material requirement, annual volume, order pattern and validation scope tied to one inquiry. Mark unresolved points as assumptions so they can be priced and closed before tooling or production commitment.

Conclusion

Consolidate only where a joint has no necessary product or lifecycle function and the combined molding remains robust. Total cost, change risk and service matter as much as part count.

References

Facebook
X
LinkedIn

Wait, We Have Something Special for You!

Join our mailing list and receive a 10% discount on your next mold or CNC project.

Request a Quick Quote

Send your drawings and detailed requirements via:
Email: jerry@ckmold.com

Or fill out the contact form below:

We will contact you within one working day. Please pay attention to the email with the suffix “@ckmold.com”